image/svg+xmlDoctoral Degree In Engineering Technology
2010 - 2013
Master's Degree In Project Management
2001 - 2002
Bachelor's Degree In Electrical Engineering
1984 - 1987
Senior Electrical Designer, Butler International
- West Lafayette, IN
December 2000 - June 2001
Electrical & Instrumentation Designer, Eli Lilly and Company
- West Lafayette, IN
December 1996 - January 2000
Instrument Technician, Eli Lilly and Company
- West Lafayette, IN
May 1993 - May 1996
Electrical Foreman (Part-Time), Action
- West Lafayette, IN
July 1986 - June 1987
Electrical Systems
Surgical Procedures
Control Systems
NEC
Instrumentation Design
Electrical Construction
Electrical Design
Temperature Transmitters
High Voltage
DCS
Austin Moore
62028 S. Evergreen St., West Lafayette, IN 85556 |
amoore@example.com
|
(440) 555-8444
Education
Purdue University - West Lafayette, IN
Purdue University - West Lafayette, IN
Purdue University - West Lafayette, IN
Experience
Experienced in AutoCAD, Micro Station SE and Micro Station J.
Associated programs included AutoCAD, FileNet, Webnow as well as multiple Microsoft office utilities.
Revised electrical schematics for Landfill Gas to Energy/ WWTP projects using AutoCAD 2009.
Ensured accurate implementation of manufacturing and installation specifications for Early Production Facility
project; promoted to assist head of electrical department.
Designed FPGA's using the Altera Cyclone family.
Experienced with Industrial control networks; Ethernet I/P, ControlNet, DeviceNET, DH+, Remote I/O.
Commissioned new equipment and wrote calibration procedures.
Worked with AutoCAD or equivalent drafting and understanding electrical, pneumatic and process flow prints.
Worked with Supervisory Control and Data Acquisition (Wonderware SCADA) programming; Wonderware Intouch
10.0.
Worked with Troubleshoot of control system problems over the phone or directly through the company VPN.
Assisted Delta V DCS troubleshooting.
Calibrated all weights and measures equipment to NBA-traceable standards in accordance with FDA regulations.
Monitored and calibrated critical differential temperature sensors, pressure, and humidity sensors.
Provided detailed documentation of all activities in accordance with FDA regulations.
Worked under controlled environment following cGMP, cGLP guidelines and Good Documentation Practices.
Installed new electrical components in DEP water treatment plant using approved PVC coated galvanized
conduit.
Performed electrical preventive maintenance on HVAC equipment.
Followed schematic diagrams, blueprints and other specifications to meet NEC code regulation.
Operated various heavy equipment for site preparation, and accessing vertical applications.
Installed and programmed Allen Bradley Micrologix 1000, 1100, and 1400 controllers as well as Micro 800 series
PLCs.
Skills